Home  |  News  |  Job Stories  |  Island Mall

Island Mall


Ka Makana Ali'i, the first regional shopping mall to be built on Oahu in over 30 years, challenged the capabilities of man and machine to place concrete in complicated areas.

A Putzmeister boom pump and Telebelt® conveyor teamed up to place concrete for more than 25 slab pours under extremely low heights.

A Putzmeister boom pump and Telebelt® conveyor teamed up to place concrete for more than 25 slab pours under extremely low heights.

A Putzmeister boom pump and Telebelt® conveyor teamed up to place concrete for more than 25 slab pours under extremely low heights.

The Z-Fold boom of the 43Z-meter and a shorter end hose are shown placing concrete under low ceilings.

The long reach of the 47Z- and 43Z-meter boom pumps was needed to access in-between an upper deck and overhead roof for placing concrete at the mall's grand entryway.

Boom pump sizes from 36 to 61 meters were dispatched to place concrete depending on what level was under construction for the six-story hotel that was adjacent to the mall.

Boom pump sizes from 36 to 61 meters were dispatched to place concrete depending on what level was under construction for the six-story hotel that was adjacent to the mall.

Island Mall

Ka Makana Ali'i, the first regional shopping mall to be built on the Hawaiian island of Oahu in over 30 years, opened fall 2016 as scheduled. Helping keep phase one of the large, multi-dimensional project on track was Putzmeister concrete placing equipment, with its distinctive capabilities and competent operators, to tackle highly complex concrete placement.


The transformation of 67 acres of land to build the mixed-use shopping center began March 5, 2015 with the groundbreaking of the 1.4 million-square-foot (130,064m²) mall, of which phase one encompasses 52 acres and 753,000 (70,000m²) square feet. Known as the Second City of Oahu, Kapolei is now home to the open air center that will ultimately include more than 150 shopping, dining and entertainment offerings, two hotels and LEED-certified office space once the second phase is complete, making it the second largest regional shopping center in the Hawaiian islands.


Steel First, Concrete Later
The nature of the construction project required steel frame buildings to be installed first. Only then, could concrete, at a six-inch (150mm) thickness, be placed for the slab on grade.


“The major obstacle of this project was that the slab's footprint was super wide and the roof was already overhead, so we needed a way to reach under a low 20-foot (6m) height while continuously placing concrete to avoid cold joints,” said Lawrence Calpito, Project Superintendent of Nordic PCL Construction, the Honolulu-based general contractor established in 1938. No stranger to high-profile projects, Nordic was responsible for the timely completion of phase one of the large and widely publicized mall.


For concrete placement, Nordic turned to Kapolei-based Ohana Concrete Pumping Co., Inc. Ohana, a family-owned business founded in 2005, had the experience and the wide variety of equipment with the exact features that could accommodate the task at hand. They even had the close proximity to the jobsite, having recently relocated their facilities, ironically, across the street from the mall.


Low Heights, No Problem
To overcome the low roof situation, a strategic plan was devised that would be used for more than 25 slabs of the L-shaped mall. For each pour, a truck-mounted telescopic belt conveyor and a truck-mounted concrete boom pump teamed up to place concrete in designated sections sized approximately 200 foot wide and 150 foot long (61m x 46m). Each slab pour required about 300 cubic yards (230m³) of concrete.


“The Telebelt® TB 110 conveyor was perfect for this plan, as it had the low operating height under 16 foot (4.9m) and the long 110 foot (33.5m) horizontal reach we needed; and because the conveyor has a telescopic boom, it was extremely easy to operate around the obstacles in the way,” said Joe Frederick, Vice President at Ohana. “Plus, we just couldn't do the job without the Z booms of the 36Z-, 43Z- and 47Z-meter pumps we used on these pours." The versatile booms could snake under the low ceiling for effective access, and a shorter end hose was used to better assist with the height restrictions.


No Break in the Action
For setup, the conveyor was positioned on one side of the slab, the boom pump on the other. The conveyor would begin the concrete placing process, working from the edge of the slab toward the center. Once its telescopic boom was extended to maximum horizontal reach, the end hose of the outstretched boom of the truck-mounted concrete pump would take over in the middle and work back toward the edge where it was set up.


With numerous columns in the way, both units were prevented from remaining in the same setup location for the entire duration of the pour. Therefore, the boom pump and conveyor would need to take turns relocating to a new spot and returning to place concrete for the slab.


Understanding the need for speed, the operators quickly moved and safely re-setup their units. "The process was fast, and the operators were ready to pump again in less than 15 minutes, so there was never an interruption in placing concrete,” said Frederick.


Credit is Due
"Even though the equipment had the resourceful features that could accommodate the height restrictions, it took our highly skilled operators to maneuver the booms of the conveyor and boom pump exactly where needed, while doing so without hitting a low beam or swinging into a column," notes Frederick. "Plus, each operator had to relocate their unit three times during each slab pour, and they still never missed a beat." Consequently, the equipment and operators get credit for providing the most time- and labor-saving method of concrete placement possible.


Added Dimensional Tasks
The architecture of the mall's grand entryway required placing concrete for an upper deck, again with an overhead covering already in place. As a result, the larger 43Z- and 47Z-meter boom pumps in Ohana's fleet were put to work. The units had a long reach at 138'5" (42.19m) and 151'3" (46.10m) respectively, as well as the special boom configurations to extend its first boom up and then stretch its other boom sections over the deck and under the roof, reaching from one edge of the upper deck to the other to efficiently place concrete.


Beyond placing 15,000 cubic yards (11,468m³) of concrete for the mall, an additional 3,300 cubic yards (2,523m³) were needed for an adjoining 175-key hotel, the Hampton Inn & Suites. Varying boom pump sizes from 36 to 61 meters were dispatched to handle concrete placement, depending on what level of the six-story, 100,000-square-foot (9,290m²) building was under construction.


Adding further dimension to the number of tasks Ohana handled for the mall was a tilt-up project to construct the 24 Hour Fitness® Super Sport Club, which included 35,000 square feet (3,250m²) of indoor workout space. The 47Z- and 61-meter boom pumps were responsible for placing 2,500 cubic yards (1,910m³) of concrete for two slabs and placing 30 cubic yards (23m³) for each of 33 panels. The numerous 20 x 30 foot (6 x 9m) panels were completed in seven different pours.


An assortment of specialty concrete placing tasks also required the long reach of the 61-meter at a 197'2" (60.10m) reach to extend over mall buildings to reach areas on the other side. Although small patches of concrete were placed by such a large boom pump in this manner, it was still considered the more labor-saving approach to get these one-off jobs done quickly.


Go West
Envisioned as the premier gathering place for the community, Ka Makana Ali`i will meet the shopping and dining demands of West O'ahu, where more than 80,000 new homes are projected to be constructed by 2025. Its convenient location offers excellent highway access, ample parking and is within a mile of the Kapolei (Rail) Transit Center.


SPECS:
Developer: DeBartolo Development, LLC—Honolulu, Hawaii
Architect: Architects Hawaii Limited—Honolulu, Hawaii
General Contractor: Nordic PCL Construction, Inc.—Honolulu, Hawaii
Concrete Placing Contractor: Ohana Concrete Pumping Co., Inc. Kapolei, Hawaii
Ready mix supplier: Hawaiian Cement—Aiea, Hawaii
Equipment: Putzmeister 61-Meter, 47Z-Meter, 43Z-Meter and 36Z-Meter Truck-Mounted Concrete Boom Pumps; Putzmeister Telebelt® TB 110 Telescopic Belt Conveyor